UMC combines three innovative medical centers: the Republican Diagnostic Center (RDC), the National Scientific Center for Motherhood and Childhood (NSCMD) and the National Center for Children's Rehabilitation (NCDR).
In the collaboration between UMC and Nazarbayev University, our company took part in the project on the construction of Nazarbayev University School of Medicine.
Having extensive experience in working on projects in the medical field, CVL completed the list of works for Highvill:
Design;
Supply of OV, VK, TCS systems;
Installation of OV, VK, TXS systems;
Engineering works on the external network of the building.
Hilton Hotel Astana
Nur-Sultan
2013-2020
General customer
Bi Group company
Project description
Hilton Astana is an ultra-modern hotel on the territory of the futuristic EXPO-2017 exhibition complex.
As part of the partnership with Bi Group and the fulfillment of the assigned obligations, our company supplied and installed equipment for HVAC systems.
Orken Village watchtower
Atyrau region, Tengiz
2019
General customer
Consortium ISKER LLP
Project description
Continuing to fulfill its obligations on the technological territory of the Tengiz field, CVL participated in the construction of a new residential town for employees of the organizations.
In terms of comfort and equipment, Orken can be compared to a residential complex nestled among the steppe, industry, heavy equipment and field conditions.
For this project, CVL supplied heating and ventilation equipment.
Nazarbayev Intellectual School Pavlodar
Pavlodar
2010-2012
General customer
Bekzholy NS LLP
Project description
Nazarbayev Intellectual School of Chemistry and Biology in Pavlodar began its work on August 27, 2013, on the eve of the new academic season and became the 14th Intellectual School, opened by the initiative of the head of state.
The new school in Pavlodar has become the basis for introducing innovations into the educational process and improving the qualifications of teaching staff.
CVL is very proud of the opportunity to contribute to the development of the youth of the Republic of Kazakhstan, a contribution that will bring up a new generation of specialists and figures whose vocation will be to change our country for the better.
CVL has implemented a full cycle of turnkey capital construction of the school.
Nur-Sultan
Fitness Palace
Petropavlovsk
Kazaeronavigatsia JSC building
Atyrau region, Prorva, Tengiz
Tengizchevroil
Nur-Sultan
Expo 2017 organizers office
Fitness Palace
Nur-Sultan
2012
General customer
Kurylyshy LTD LLP
Project description
Fitness Palace Astana is a new premium fitness club on the left bank of Astana with a total area of 10,000 square meters, located in the new administrative center of the capital, in a building specially designed for a fitness center. Unique interior design, modern technology, excellent equipment, spacious and comfortable rooms.
As part of the Fitness Palace project, CVL supplied and installed HVAC equipment.
Kazaeronavigatsia JSC building
Petropavlovsk
2018
General customer
Altyn Amir LLP
Project description
In 2018, in the city of Petropavlovsk, CVL carried out large-scale work on the reconstruction and overhaul of the Kazaeronavigatsia building.
Within the works of this project, the following was implemented:
Redevelopment of 100 sq.m. of the building;
Dismantling and installation of 15 km of ventilation systems;
Dismantling and installation of 100 km of communication and electrical lines in the building;
Dismantling and installation of building heating systems;
Reconstructed and renovated 1000 sq.m. of the building.
Tengizchevroil
Atyrau region, Prorva, Tengiz
2018
General customer
Tengizchevroil
Project description
A large CVL project implemented in the Atyrau region, at the largest onshore oil field in the Republic of Kazakhstan - Tengiz.
The project was implemented by a direct master contract with Tengizchevroil, which speaks of a huge credit trust from the top 1 oil company in Kazakhstan.
We have implemented the scope of work for a complex of facilities along the cargo transportation route (MaTraG, PBR, TCO):
Wastewater treatment plant building;
Ambulance buildings;
Fire station buildings;
Workshops;
Repair shops.
As part of the fulfillment of the assigned obligations, CVL has successfully performed the following types of work:
Design;
Equipment supply;
Production;
Tests;
Preparation of paperwork;
Installation supervision;
Start-up and adjustment of ventilation and refrigeration systems.
Expo 2017 organizers office
Nur-Sultan
2015
General customer
Petroline Bau LLP
Project description
As part of a contract for Petroline Bau, CVL designed a geothermal heating system and a heat point for the office of the organizers of the Expo 2017 exhibition.
In addition, our company has implemented the supply of heat pumps and equipment installation.
Zhambyl region, Shu
Taraz Chemical Park
Nur-Sultan
Electric locomotive assembly facility
Nur-Sultan
Milano Business Center
Nur-Sultan
Baiterek Business Center
Taraz Chemical Park
Zhambyl region, Shu
2018
General customer
ISS Engineering LLP
Project description
The special economic zone "Taraz Chemical Park" was created in accordance with the Decree of the President of the Republic of Kazakhstan dated November 13, 2012 No. 426 "On the creation of a special economic zone “Taraz Chemical Park". The main goal of the SEZ is the creation of new production of chemical products with high added value through the use of modern, environmentally friendly technologies in Kazakhstan.
On one of the technological objects of this industrial complex, namely the cleaning building and the warehouse of reagents, the CVL company supplied ventilation equipment.
Electric locomotive assembly facility
Nur-Sultan
2012
General customer
Naiza Kurylys LLP
Project description
The construction of the LLP "Elektrovoz krastyru zauyty" facility was carried out in the period from October 2011 to December 2012. By the decree of the Government of the Republic of Kazakhstan, the organization of production of electric locomotives is recognized as a strategic investment project. The founders of the enterprise are Alstom (France, 50% in the authorized capital), JSC National Kazakhstan Temir Zholy Company (25%), CJSC Transmashholding (Russia, 25%).
LLP "Electric locomotive kurastyru zauyty" aims not only to renew the traction fleet of Kazakhstan, but also to export products to the market of the "1520" space.
Taking part in an important and illustrative project for the industry of the Republic of Kazakhstan, CVL supplied and installed equipment for HVAC systems.
Milano Business Center
Nur-Sultan
2014
General customer
Bi Group company
Project description
In 19 weeks and 19 days, BI Group holding erected a five-story Milano business center in the center of Astana. The successfully implemented project took place within the works of the 19th anniversary of the company and was timed to coincide with Builder's Day.
According to experts, such a building is usually erected within a year. However, the skill and new technologies allowed the BI Group to meet the deadline. 315 people of the MZhK-Premium BI Group division worked in two shifts.
Supply and installation of equipment for HVAC systems.
Taking part in this record-breaking project, CVL has been supplying and installing equipment for HVAC systems.
Baiterek Business Center
Nur-Sultan
2013-2020
General customer
Bi Group company
Project description
The "A" class Baiterek business center is located in the iconic place of the city of Astana - near the territory of the Astana International Financial Center.
The facility has a well-developed infrastructure, which includes all the necessary services: coworking, banking, mini-market, beauty salon, restaurant, coffee shop, etc. Year of construction - 2017. The business center is part of the new City Walk business district.
As part of the fulfillment of contractual obligations, CVL supplied and installed HVAC systems for the Baiterek business center.
Nur-Sultan
Ray Residence RC
Nur-Sultan
Panorama Park RC
Kostanay
City Kostanai Business Center
Nur-Sultan
CCC Business Center
Ray Residence RC
Nur-Sultan
2018
General customer
Bi Group company
Project description
The architectural ensemble Ray Residenсe is made in the style of the golden time of the 1920s in the USA - the era of jazz and sophisticated Art Deco. The style of the complex is characterized by strict geometric shapes, semitone decoration, luxury, chic, and expensive modern materials. The combination of the noble light color of the facades and the bronze metal inserts on the balconies and windows lends a special elegance.
At the same time, the entire residential complex is equipped with modern technologies and solutions. One of the parts of the technical equipment is the HVAC system, which was implemented by CVL.
Panorama Park RC
Nur-Sultan
2018
General customer
Bi Group company
Project description
Panorama Park —a residential complex with an authentic design and a mesmerizing view from the windows to the Botanical Garden, a unique landscape structure occupying 100 hectares of land.
The green area, playgrounds, and sports grounds, walking paths, and recreation areas inside the courtyard have been created specifically so that each resident of the complex can comfortably spend time with their family.
The comfort in the house continues, among other things, due to the HVAC system, which was equipped with this residential complex by CVL.
City Kostanai Business Center
Kostanay
2012
General customer
TSUM LLP
Project description
The “City Kostanai” business center is a class A facility that includes modern office premises. All engineering systems of the business center, including high-speed elevators, comply with modern construction standards. The building equipment meets the most stringent requirements for functionality and reliability.
In addition to conventional engineering systems, the City Kostanai business center is equipped with an individual climate control system, heating, air conditioning and ventilation, thermal curtains, an independent power supply system, security, and access control systems, video surveillance, automatic fire alarms, parking management, and all necessary equipment.
The role of CVL in the construction of this facility was the supply and installation of equipment for HVAC systems.
CCC Business Center
Nur-Sultan
2007
General customer
CCC Company
Project description
Built-in 2007 on Dinmukhameda Kunaev street, customer CCC company.
Offices of many organizations are located here. The CCC business center can boast about its large office spaces and conference rooms for important negotiations.
As part of the construction of the business center, CVL has supplied the project with high-quality aluminum radiators.
Nur-Sultan
Zelenyy Kvartal RC
Nur-Sultan
Promenade Burabay RC
Nur-Sultan
Sesam RC
Nur-Sultan
Reference Center
Zelenyy Kvartal RC
Nur-Sultan
2019
General customer
Bi Group company
Project description
“Zelenyy Kvartal” residential complex is a large-scale project, unique for a number of reasons at once and combining urban comfort with calmness and clean air typical for the suburbs.
CVL's obligations in this project were the supply and installation of equipment systems for HVAC systems.
Promenade Burabay RC
Nur-Sultan
2019
General customer
Bi Group company
Project description
Promenade Burabay — a residential complex located at the very heart of the "Pearl of Kazakhstan" - on the shores of Lake Borovoe. In these cozy apartments, you can take a break from the bustle of the city, enjoy the beauty of nature, restore physical health and mental balance.
As part of the work on this unique and modern solution, CVL carried out the supply and installation of turnkey HVAC equipment.
Sesam RC
Nur-Sultan
2003-2009
General customer
Astana Trade International JSC
Project description
The residential complex "Sesam" is a tandem of two identical 22-storey buildings located in the central part of Astana, in the Almaty region, near the intersection of Imanbaeva and Kenesary streets.
Both towers of the residential complex are based on a powerful three-storey stylobate, the first level of which is a parking lot, and the second and third levels are used by commercial premises. The residential complex was built using monolithic-frame technology and was put into operation in the first quarter of 2006.
CVL carried out monolithic and finishing works, as well as the supply of building materials.
Reference Center
Nur-Sultan
2009
General customer
Elitstroy LLP
Project description
The reference center is located on the left bank of Ishim, near the new administrative center of the capital.
The construction of the center solves the main task of the state measurement system - the creation and improvement of the reference base of units of quantities, the establishment of rules for their creation, approval, storage.
The newly built republican enterprise houses organizations working in the field of standardization, metrology, and certification of the Ministry of Industry and Trade of the Republic of Kazakhstan, RSE "KazInMetr" with laboratories, RSE "KazInst" - an institute for standardization and certification.
CVL has fulfilled its obligations to supply equipment for HVAC systems.
Nur-Sultan
Avenue 5 RC
Nur-Sultan
ЖК Promenade Expo
Nur-Sultan
Park Avenue RC
Nur-Sultan
Kaminny RC
Avenue 5 RC
Nur-Sultan
2018
General customer
Bi Group company
Project description
The Avenue 5 project combines strict style, unusual zoning, and modern materials. The residential complex has become a decoration of the capital, a striking architectural phenomenon, which identifies a significant increase in the quality and standards of housing in Kazakhstan.
In line with the project philosophy, for this complex, CVL supplied and installed premium class HVAC system equipment.
ЖК Promenade Expo
Nur-Sultan
2015
General customer
Bi Group company
Project description
The PROMENADE EXPO residential complex will be located on the left bank of Astana along Mangilik El Avenue, on both sides, in close proximity to the BI Village cottage area and the EXPO-2017 territory.
The project of the complex consists of 4 blocks - Promenade Expo-A, Promenade Expo-B, Promenade Expo-C, Promenade Expo-D, which include 5-18 storey residential buildings, parking, administrative facilities, shops, trade, and service infrastructure.
As part of the work on this project, CVL carried out the supply, installation, and commissioning of equipment for HVAC systems.
Park Avenue RC
Nur-Sultan
2013-2020
General customer
Bi Group company
Project description
Nur-Sultan - a modern capital with unique architecture, history, and culture. Every year more and more new buildings arise here, which are distinguished by high comfort and functionality. Such is the new Park Avenue residential complex project belonging to the business class segment.
The Park Avenue LCD is located in Astana at the intersection of Orynbor st., No. 26 st., Turkestan st. and Akniet st. This complex is the embodiment of your ideas about comfortable housing.
One of the aspects of providing comfort is a modern and high-quality HVAC system, which was developed by our company CVL.
Kaminny RC
Nur-Sultan
2003-2009
General customer
Astana Trade International JSC
Project description
RC "Kaminny" consists of 13 and 17-storey sections, the facades of which are in red ceramic bricks, it is located in the Almaty district of Astana, in the square of Kenesary - Asan Kaigy - Louis Pasteur - Syrdariya streets.
The residential complex was named "Kaminny" for a reason. The main attribute of the interior of each apartment is an electric fireplace, a symbol of comfort and warmth of the hearth. In the corridor halls, there are "flower beds" with decorative flowers and climbing plants, thanks to which the atmosphere of comfort and warmth does not leave the complex even in winter.
CVL carried out monolithic and finishing works, as well as the supply of building materials.
Nur-Sultan
Nova City RC
Atyrau
Zaman RC
Nur-Sultan
Triumphal Arch RC
Nur-Sultan
Arnau Premium RC
Nova City RC
Nur-Sultan
2017
General customer
Bi Group company
Project description
“Nova City on Turan” RC designed for modern urban dwellers. Bright facades, comfortable layouts, and well-developed infrastructure. Sports grounds, walkways, and a good mood. A real city of feelings, in which everyone will find their place for a comfortable, happy life.
This comfort is also provided by the HVAC system, which was made by CVL.
Zaman RC
Atyrau
2019-2020
General customer
Bi Group company
Project description
This project is the first one for our partners in Atyrau. The complex corresponds to the Business class and gives its new settlers comfort and privacy in the very center of the city, which continues to be built with new buildings.
As part of this project, CVL has supplied and installed HVAC systems for the comfort and stable life of residents.
Triumphal Arch RC
Nur-Sultan
2015
General customer
Bi Group company
Project description
“Triumphal Arch” RC — complex of multi-apartment residential buildings in Astana. The complex has all the attributes of a business class: advanced construction technologies, high-quality materials, modern engineering equipment, an enclosed area, an access control system.
Within the framework of this project, CVL supplied and installed equipment for HVAC systems.
Arnau Premium RC
Nur-Sultan
2015
General customer
Kurylyshy LTD LLP
Project description
The residential complex "Arnau" is a kind of city within a city, a separate block located far from the city noise, but inscribed in the developing infrastructure of the capital.
The quarter is a complex of 15 houses of various storeys: seven, eight, and nine-storey brick buildings.
CVL has carried out work on internal engineering systems, thereby improving the quality and durability of systems in the residential complex. The total length of the systems was 15 km.
Nur-Sultan
Moskva RC
Almaty
Art Residence RC
Nur-Sultan
Olymp Palace RC
Nur-Sultan
Premiera RC
Moskva RC
Nur-Sultan
2006
General customer
AlNura Holding LLP
Project description
The residential complex "Moskva" consists of two 23-storey buildings located in the central part of Astana, in the Almaty region, near the intersection of Imanov and Valikhanov streets. The developer is AlNura Holding LLP.
During the implementation of this project, CVL was engaged in the supply and installation of equipment for HVAC and NVC systems.
Art Residence RC
Almaty
2018
General customer
Bi Group company
Project description
Art Residence in Almaty is a residential complex of Business class.
The residential complex is a separate block with a fenced area. During the construction, high-quality building materials and energy-saving technologies were used.
As part of this project, CVL has supplied and installed HVAC systems.
Olymp Palace RC
Nur-Sultan
2003-2009
General customer
Astana Trade International JSC
Project description
RC "Olymp Palace" is a U-shaped building made out of 12 sections with a variable amount of storeys - 11 and 16 floors. The new building was built using a monolithic-frame technology filled with an aerated block (interior partitions are made of foam block, it provides excellent sound insulation). One of the biggest advantages of the house is the panoramic windows which open up beautiful views of the city. The architecture is such that the house forms a closed courtyard with all amenities.
CVL carried out monolithic and finishing works, as well as the supply of building materials.
Premiera RC
Nur-Sultan
2018
General customer
Bi Group company
Project description
“Premiera” RC in Nur-Sultan - a business-class residential complex, which is being created for people striving for freedom and space. Residential complex "Premiera" is located in the center of the left-bank part of the city at 22 Kabanbay Batyr Avenue. Not far from the quarter there are two popular city objects - the Mega Astana shopping center and the circus. Due to the favorable location of the Premiera residential complex, its residents can be anywhere in Nur-Sultan in a matter of minutes.
Maintaining maximum comfort and coziness in the residential complex, CVL has supplied and installed equipment for HVAC systems.
Nur-Sultan
Akbulak Town RC
Nur-Sultan
Fortuna RC
Nur-Sultan
Zvezda Astany RC
Nur-Sultan
Astana Meruert RC
Akbulak Town RC
Nur-Sultan
2013-2020
General customer
Bi Group company
Project description
Akbulak Town Residential Complex consists of 9 and 14-storey buildings with built-in and attached premises, it is located at the intersection of B. Momyshuly and Tauelsizdik avenues.
All buildings of the residential complex are made out of bricks. The facade of the complex is made out of keratvin, which is one of the most durable and, at the same time, beautiful building materials. Bold architectural solutions and a bright façade of rich color set it apart from the surrounding buildings.
In this project, CVL's responsibilities were to supply and install the HVAC equipment.
Fortuna RC
Nur-Sultan
2003-2009
General customer
Astana Trade International JSC
Project description
Residential complex "Fortuna" is located in the old city center, in the Almaty district of Astana, on Kenesary st., between Toraigyrov and Gabdullin streets.
The RC was put into operation in 2004. During the construction of the house, high-quality certified materials of European manufacturers, new generation equipment, as well as the latest achievements in the field of construction and design were implemented.
CVL carried out monolithic and finishing works, as well as the supply of building materials.
Zvezda Astany RC
Nur-Sultan
2003
General customer
Bazis company
Project description
RC "Zvezda Astany" is a modern residential complex, characterized by spacious apartments with a convenient layout, interesting architectural solutions, and developed nearby infrastructure.
The complex is located on the embankment of the Esil River, which gives all residents the opportunity to spend their leisure time in a picturesque place out in the fresh air. Erected in 2005, this residential complex harmoniously blended into the city panorama, and its building is well recognized by residents and guests of the city.
Within the work of this project, CVL took care of supplying equipment for heating systems.
Astana Meruert RC
Nur-Sultan
2006
General customer
MGT Astana LLP
Project description
Residential Complex "Astana Meruert" is a large 16-storey residential complex with built-in commercial premises and business center, which is located in Almaty district Nur-Sultana, near the intersection of Momyshuly Avenue and Satpayev Street.
CVL was engaged in the supply and installation of equipment for the HVAC system in a residential complex.
Nur-Sultan
Altyn Orda RC
Nur-Sultan
Astana Railway Station
Nur-Sultan
City Children's Hospital No.2
Nur-Sultan
City Children's Infectious Diseases Hospital
Altyn Orda RC
Nur-Sultan
2008
General customer
Astana Nedvizhimost JSC
Project description
"Altyn Orda" - a 15-storey residential complex located in the Saryarka district of Astana, on Bokeikhana st., near the Esil river embankment.
The complex consists of three high-rise buildings, united by a common 5-storey gallery. The main facades at the top have a characteristic bevel. Stained glass loggias extend to the top of each house. The buildings are monolithic, finished with porcelain stoneware.
During the construction of the residential complex, CVL fulfilled its obligations to supply quality equipment for heating systems.
Astana Railway Station
Nur-Sultan
2005
General customer
NC Kazakhstan Temir Zholy JSC
Project description
Nur-Sultan I - railway station of JSC "NC "Kazakhstan Temir Zholy", located in the capital of Kazakhstan, Nur-Sultan. It was the main railway station of the city before the new Nurly Zhol station was commissioned in 2017.
The major reconstruction of the station was carried out in 2004-2005, after which the capacity of the station increased by 300 seats. Average daily throughput capacity of the station was 5.2 thousand passengers, actual departure - 4.8 thousand passengers.
CVL was supplying the project with heating equipment.
City Children's Hospital No.2
Nur-Sultan
2006
General customer
Public Health Management Authority
Project description
CVL company, in the set time limit, implemented a high-quality overhaul of the city children's hospital №2 in Nur-Sultan, by order of the Public Health Management Authority.
The objective was to renovate the interior of the hospital, the water supply systems, the electrical mains of the building, the sewerage and ventilation systems of the building.
City Children's Infectious Diseases Hospital
Nur-Sultan
2012
General customer
Naiza Kurylys LLP
Project description
Within the possibilities of cooperation with Naiza Kurylys LLP, CVL supplied and installed HVAC systems in a children's infectious diseases hospital. The importance of this project lies in the critical importance of air delivery and filtration for young patients.
Children are our future, and realizing the fundamental nature of this expression, we have provided the hospital with the highest quality equipment and filters.
We are proud to be able to contribute to the recovery of our future generations.
Nur-Sultan
Office building
Atyrau
Production hangar Burkit International
Nur-Sultan
Tau Tengri RC
Nur-Sultan
Orda Tower RC
Office building
Nur-Sultan
2019
General customer
Altyn Amir LLP
Project description
One of the projects in the piggy bank of the CVL company, in which the company acted as the general contractor.
Under entrusted obligations, our company has carried out turnkey capital construction.
Production hangar Burkit International
Atyrau
2019
General customer
Borkit International LLP
Project description
As a way to strengthen its position in Western Kazakhstan, CVL supplied, installed, and launched air conditioning systems for the production facilities of Borkit.
Within the works of this project, 2 km of air conditioning systems were implemented with a total capacity of 300 cubic meters of cold air every minute.
Tau Tengri RC
Nur-Sultan
2019
General customer
Otau Kurylys LLP
Project description
"Tau Tengri" residential complex - two stylish houses from fourteen to twenty-one floors, which form a cozy courtyard on the building site, closed to outsiders.
Within the works of this project, CVL supplied and installed HVAC equipment.
Orda Tower RC
Nur-Sultan
2019
General customer
Orda Invest company
Project description
The ORDA TOWER residential complex in Nur-Sultan is a 18-storey building with panoramic windows that offer a wonderful view of the capital. This is a business class house for those who value maximum comfort. The residential complex can be proud of a good location, developed infrastructure, as well as a wide selection of available layouts.
Within the framework of this project, CVL has successfully completed the supply and installation of equipment for HVAC systems.
Nur-Sultan
Millennium Alley RC
Almaty
Atameken RC
Almaty
Gúlder RC
Almaty
Bereket RC
Millennium Alley RC
Nur-Sultan
2019
General customer
Bazis company
Project description
Respectable project of Bazis company, realized with high quality, with attention to detail.
In addition to the excellent location, residents of the residential complex can boast about the level of their housing and a sense of coziness and comfort.
Part of this coziness and comfort is created by the equipment of HVAC systems, which was implemented by CVL.
Atameken RC
Almaty
2019
General customer
Bi Group company
Project description
The residential complex "Atameken" is designed for people who appreciate stability and comfort, and also opens up an incredible opportunity for residents to live in an ecologically clean area of Almaty with clean air and at the same time be close to the city center.
One of the main parts of comfort and coziness in the residential complex is the HVAC system implemented by CVL.
Gúlder RC
Almaty
2018
General customer
Bi Group company
Project description
Gúlder RC in Almaty is located on Raiymbek street in the Nauryzbay region, famous for the built Athletic Village and the sports arena, immediately stands out for its bright finishing and design.
The complex stands out for its striking facade design. The houses are most importantly designed for 12 and 16 floors. The load-bearing walls were built using brick technology from gas blocks. The monolithic base can withstand vibrations up to 9 points.
Among the whole scheme of architectural and design solutions, lies the important work of CVL in the supply and installation of the HVAC equipment system.
Bereket RC
Almaty
2018
General customer
Bi Group company
Project description
Only two wide, multi-entrance high-rise buildings make up the complex, forming a spacious courtyard. The front part is decorated in bright colors, emphasizing the novelty of the buildings. The houses have been built taking into account the strong seismic activity.
In the course of the work, environmentally friendly building materials, the latest technological solutions, effective thermal insulation, and a high-quality HVAC equipment system installed by CVL were used.
Almaty
Asyl Tau RC
Nur-Sultan
Glass factory
Nur-Sultan
Modernization of "Astana Su Arnasy" facilities
Nur-Sultan
Botanichesky RC
Asyl Tau RC
Almaty
2018
General customer
Bi Group company
Project description
The new residential complex "Asyl Tau" in Almaty is one of the projects of the BI Group. The company makes another contribution to the development of the housing market in Almaty, and new housing is the embodiment of any person's dream. The developer has thought over every little detail, paid attention to the smallest details, and all this so that every new homeowner feels cared for.
CVL made a great contribution to this ensemble of comfort by supplying and installing high-quality HVAC equipment.
Glass factory
Nur-Sultan
2015
General customer
Firma Alkon+ LLP
Project description
The enterprise produces up to 100 thousand square meters of finished products per year, the media center of the capital's akimat reports. The "KSS Astana" industrial glass processing factory is located in the Industrial Park of the SEZ "Astana - a new city".
As part of the implementation of this project, CVL carried out construction and installation work for a full cycle of the entire plant.
Modernization of "Astana Su Arnasy" facilities
Nur-Sultan
2015
General customer
GKP on the REM "Astana Su Arnasy"
Project description
A large-scale project of CVL, implemented by the GKP on the REM "Astana Su Arnasy", covering the entire territory of the city of Nur-Sultan.
Our company has carried out automation and dispatching of all heating units in the city, thereby allowing residents and guests of the city to receive heat without interruption.
CVL gives warmth and comfort to every home.
Botanichesky RC
Nur-Sultan
2019
General customer
Bi Group company
Project description
Residential complex "Botanichesky" - a comfortable building of five sections from twelve to twenty floors, located on a plot in the shape of the letter "P". The house is designed in the style of American architecture of the twenties of the past century. The appearance of the new building perfectly matches the surrounding architectural ensemble.
As part of this project, CVL has supplied and installed HVAC systems.
Nur-Sultan
Grand Opera RC
Nur-Sultan
Mangilik RC
Nur-Sultan
Sunrise RC
Nur-Sultan
7YA
Grand Opera RC
Nur-Sultan
2013-2020
General customer
Bi Group company
Project description
The concept of the Grand Opera project is based on the image of the Astana Opera - a young architectural monument of national importance, which combines the best classical traditions of world architecture and Kazakh national flavour.
For this project, CVL has supplied and installed HVAC systems.
Mangilik RC
Nur-Sultan
2018
General customer
Bi Group company
Project description
Located on a strategically important street, the “Mangilik” residential complex embodies the ambitious character of Astana residents. Development possibilities, resistance to harsh conditions, and monumental reliability - this is the very tempered spirit of the northerners.
This residential complex has been supplied by CVL with high-quality HVAC equipment.
Sunrise RC
Nur-Sultan
2019
General customer
Bi Group company
Project description
Residential complex "Sunrise" in Astana is located next to the lake on Syganak street at a distance of four kilometers from the center of the capital. The ecology is excellent here, there are no industrial enterprises nearby or too busy highways.
"Sunrise" looks spectacular against the background of neighboring residential buildings. The multi-apartment nine-section building was designed taking into account the capabilities of modern technologies, as well as the requirements for seismic resistance and energy efficiency of the complex.
One of the main parts of modern technologies in the complex is the HVAC system installed by CVL.
7YA
Nur-Sultan
2013-2020
General customer
Bi Group company
Project description
We approached the construction of a family residential complex with special attention - high-quality construction, a variety of layouts and underground parking, spacious and safe yards, quiet recreation areas and equipped playgrounds make the complex ideal for representatives of different generations.
HVAC equipment installed and commissioned by CVL is part of the complex's technical support systems, which gives comfort to its residents.
Nur-Sultan
Deluxe Town RC
Nur-Sultan
Lazurniy Kvartal RC
Nur-Sultan
Art House RC
Nur-Sultan
Arnau RC
Deluxe Town RC
Nur-Sultan
2013-2020
General customer
Bi Group company
Project description
Deluxe Town consists of 17 four-storey neoclassical-style houses with wrought-iron balconies. The houses form a club-type residence with their own landscaped territory. This is facilitated by the location: in the very center of the BI Village residential area, it is the quietest and most ecologically clean area of the capital. The entire design is based on two principles - functionality and comfort.
The HVAC equipment supplied and installed by CVL is also responsible for comfort.
Lazurniy Kvartal RC
Nur-Sultan
2013-2020
General customer
Bi Group company
Project description
A large residential complex consisting of more than 12 apartment buildings with built-in commercial premises and several free-standing parking lots.
All buildings of the residential complex have rounded or wave-like stained-glass windows of a characteristic azure color, as well as the same sail-shaped decorations at the top of the houses.
The HVAC system in this residential complex was built and launched by CVL.
Art House RC
Nur-Sultan
2013-2020
General customer
Bi Group company
Project description
LCD Art House in Astana at the intersection of Almaty st. and Turkestan st. is a housing of a fundamentally new format, which involves the construction of not only residential buildings but also providing them with all the infrastructure necessary for life.
The complex uses the latest technical solutions. The water filtration system, which installed in each apartment, will also be a pleasant bonus for the whole family. Also, a modern video surveillance system, a fire safety system, motion sensors, and an electronic barrier installed in the residential complex, which will protect its residents from other people's cars.
Another big plus of the complex is the high-quality HVAC system made by CVL.
Arnau RC
Nur-Sultan
2013-2020
General customer
Bi Group company
Project description
“Arnau” RC located in Astana along with Ula Dala avenue, embodies the concept of a city within a city. This is a separate residential area, at the same time inscribed in the modern infrastructure of the capital and far from the bustle of the city.
To maintain the comfort of living in this residential complex, CVL carried out work on the supply and installation of HVAC systems.
Нур-Султан
Kamal RC
Nur-Sultan
Bi Town RC
Nur-Sultan
Orynbor Towers RC
Nur-Sultan
Expo Residence RC
Kamal RC
Нур-Султан
2013-2020
General customer
Bi Group company
Project description
“Kamal” — is an economy class RC in Astana, located in the Esil district. The advantage of this residential complex is its location - the area is developing, but at the same time the main highways - Mangilik El, Kabanbai Batyr - pass through it, making it easy to get anywhere in the capital.
Despite the positioning of the project as economy class housing, BI Group and partners have not canceled the fact that the technical equipment of houses must be of high quality.
Within the framework of this project, CVL carried out the supply and installation of equipment for the HVAC system.
Bi Town RC
Nur-Sultan
2019
General customer
Bi Group company
Project description
BI Town - is a private club-type residence located in a quiet, ecologically clean place on the left bank of Astana, which forms a natural recreational area.
A new low-rise residential complex consisting of 4-5 floors is an excellent option for a comfortable life. European style houses and picturesque landscapes create a unity of nature and modern architecture.
Nevertheless, every house in BI Town is a facility provided with all the necessary technical equipment. Including, made by CVL - supply, and installation of HVAC systems.
Orynbor Towers RC
Nur-Sultan
2013-2020
General customer
Bi Group company
Project description
The Orynbor Towers residential complex in Nur-Sultan has an attractive location along Mangilik El Avenue, very close to the EXPO-2017 exhibition site.
A modern multi-storey building with a wide panorama - that is the Orynbor Towers. In addition to the excellent appearance, the developer took care of the correct design of the building.
A warm residential complex will help its residents to survive the cold winter and strong winds without much discomfort, CVL took care of this by supplying and installing equipment for HVAC systems.
Expo Residence RC
Nur-Sultan
2013-2020
General customer
Bi Group company
Project description
Expo Residence is a modern residential complex located in the square of Uly Dala, Kabanbai batyr, Mangilik El, and Turara Ryskulov streets.
Our company delivered equipment for this project, as well as the installation and commissioning of HVAC systems.
Nur-Sultan
Vivat Promenade RC
Nur-Sultan
Arman Kala RC
Nur-Sultan
Britanskiy Kvartal RC
Nur-Sultan
Club House RC
Vivat Promenade RC
Nur-Sultan
2015
General customer
Bi Group company
Project description
Vivat Promenade - the bright dominant of the Promenade Expo residential complex. The house is designed taking into account the tastes, wishes, and needs of people of different ages. A distinctive feature of the complex is its low number of storeys: from 6 to 8 floors. We have created a harmonious space where it will be comfortable to live, relax, and work.
Our company has supplied and installed equipment for HVAC systems in a residential complex.
Arman Kala RC
Nur-Sultan
2013-2017
General customer
Bi Group company
Project description
“Arman Kala” RC — A comfort-class complex of 10 buildings on the left bank of Astana in the Yesil district along the Mangilik El highway and Turkestan street.
"Arman Kala" in Astana consists of 7-, 9-storey monolithic houses made of silicate bricks and 17-storey monolithic reinforced concrete towers.
CVL delivered, installed, and commissioned the HVAC system for this residential complex.
Britanskiy Kvartal RC
Nur-Sultan
2014
General customer
Bi Group company
Project description
Britanskiy Kvartal RC consists of two 5-storey buildings located in the Almaty district of Astana, in the square of Kadyrgali Zhalayyri, Sarkyram, Askar Tokpanov streets, and the Tolkyrauyn intersection.
The complex was built of bricks and commissioned in 2014. The buildings are completed in the style of British architecture, which determined the name of the entire residential complex.
Within the framework of this project, CVL supplied and installed the HVAC system in the residential complex.
Club House RC
Nur-Sultan
2013
General customer
Best-Grupp NS LLP
Project description
Astana's Club House RC was built according to an exclusive project. It is an 8-storey club-type building with 20 apartments with one entrance. It was erected using a monolithic frame technology filled with an eco-block and insulated with an eco-cover. The facades are finished with travertine and granite.
Within the framework of this project, CVL carried out work on the installation of a ventilation system.
Nur-Sultan
Factory of the production of electro-optical devices
Nur-Sultan
Raduga RC
Nur-Sultan
Burlin RC
Nur-Sultan
State Administration "Medical Center for Mental Health Problems"
Factory of the production of electro-optical devices
Nur-Sultan
2013
General customer
Naiza Kurylys LLP
Project description
The enterprise was created thanks to the agreement of the 1st President of Kazakhstan and the President of Turkey. The opening was attended by the Minister of Defense of the Republic of Kazakhstan Adilbek Dzhaksybekov and the Minister of National Defense of Turkey Ismet Yilmaz, who examined the facility and got acquainted with the samples of products. The factory produces electronic boards used in various equipment (from submarines to space ships), the production of which is possible only on the available special equipment.
The company also has its own production of infrared lenses, the making,, processing and coating process of which will be carried out at the nanoscale. This is the first enterprise in the CIS to manufacture products of this quality. For high-level production of this nature, it is very important to build a high-quality air intake and filtration system. This commitment has been fulfilled by CVL.
Raduga RC
Nur-Sultan
2008
General customer
Astana Nedvizhimost JSC
Project description
The residential complex "Raduga" is located in a prestigious and convenient place in the Esil district of Astana, between Kabanbay Batyr avenue and Korgalzhyn highway, behind the building of the capital's circus.
The house was built using monolithic frame technology and finished with porcelain stoneware. The unique exterior with triangular windows on the facade cannot be confused with other residential complexes. The three sections of the building are 10, 12, and 14 stories high.
The windows of the apartments offer a beautiful view of the Central Park, the building of the capital's circus, the Duman Oceanarium, the Ferris wheel, the right and left banks of Astana.
CVL organized the supply of equipment for heating systems in the apartments of the residential complex. Now, along with a beautiful view from the window, the residents of the complex will always have warm and cozy apartments.
Burlin RC
Nur-Sultan
2008
General customer
Burlin Gas Stroy LLP
Project description
Residential complex "Burlin" is located on one of the main highways of the Saryarka region of Astana - Saryarka Avenue. This is a very promising area with a well-developed infrastructure. The facility was commissioned in 2007-2008.
The residential complex consists of three houses with 12, 15, and 17 floors. The building material is the monolith. The first, 12-storey block has 4 entrances, each site has only three apartments.
The participation of CVL in the construction of this residential complex was in the obligation to supply the project with quality equipment for heating systems.
State Administration "Medical Center for Mental Health Problems"
Nur-Sultan
2008
General customer
Public Health Management Authority
Project description
State Administration "Medical Center for Mental Health Problems".
Continuing the tradition of worthy projects within the period of cooperation with the State Institution "Health Administration", in 2008 CVL carried out a major renovation project of the medical center for psychological health problems.
Without betraying ourselves and our principles, we have performed our work at a high level of quality.
We really appreciate the opportunity to implement projects for the medical sector of our State. The CVL company is grateful to the State Institution "Health Administration" for their trust and strong partnership.
Нур-Султан
TB Dispensary
Nur-Sultan
Taraz RC
Nur-Sultan
Meridian RC
Nur-Sultan
Symphonia RC
TB Dispensary
Нур-Султан
2007
General customer
Public Health Management Authority
Project description
In 2007, CVL, as part of the fulfillment of entrusted obligations from the Public Health Management Authority, carried out a high-quality renovation of the facility.
Works started and completed exactly on time. State Institution "Health Administration" highly appreciated the work of our company, being satisfied with the results of the project.
Taraz RC
Nur-Sultan
2007
General customer
Kazmontazhstroy JSC
Project description
RC "Taraz" is a large complex that occupies the entire quarter between Valikhanov, Omarov, Taraz, and Abay ave. in the Almaty district of Astana.
The residential complex was built in 2007 using monolithic frame technology, the walls are lined with yellow ceramic bricks. The house has an expressive appearance with the characteristic blue stained glass balconies. The height of the residential complex varies from 5 to 14 floors, the complex includes more than three hundred apartments of various sizes and layouts.
CVL has undertaken and fulfilled its obligations to supply quality aluminum radiators.
Meridian RC
Nur-Sultan
2019
General customer
Bazis company
Project description
The Meridian residential complex is located in a promising and environmentally friendly area of Nur-Sultan, in the block of Syganak Street, Kabynbai Batyr, and Turan avenues. Meridian is a residential complex consisting of two high-rise buildings of 16 and 19 floors united by a stylobate, which provides a full range of services that create comfort. Meridian is eye-catching! Clean lines, laconic forms, natural colors of facades, elegant decorative elements, the shine of metal, and glass. This microcosm has a special charm, enhanced by atmospheric lighting that changes on weekdays, weekends, and holidays.
Within the framework of this project for the Bazis company, CVL implemented the supply and installation of equipment for HVAC systems
Symphonia RC
Nur-Sultan
2005-2009
General customer
ABK Kurylys LLP
Project description
The residential complex "Symphonia" is a 23-storey building, from which Saryarka Avenue begins from the Esil River embankment. The residential complex is located in the Saryarka district of Astana.
The complex was built using monolithic frame technology in 2009. Wall filling - foam block, exterior decoration - granite stoneware. The residential complex consists of two towers 23 and 25 floors high, united by a common stylobate part, on the ground floor of which there are commercial premises, and the parking lot is located in the basement.
As part of the construction of this residential complex, CVL was engaged in the supply of equipment for heating systems.
Nur-Sultan
Nomad RC
Nur-Sultan
Miras RC
Nur-Sultan
Duet RC
Nur-Sultan
Edem Palace RC
Nomad RC
Nur-Sultan
2005-2009
General customer
ABK Kurylys LLP
Project description
RC "Nomad" - a large residential complex with built-in commercial premises and parking, located in Yesil district of Astana, near the intersection of Syganak and Sauran streets.
The complex was erected using monolithic frame technology, has a height of 14 floors, and resembles the letter "C" in its shape. The basement of the building is faced with splitter blocks, the facade - with porcelain stoneware combined with stained glass, but from the courtyard side there are no porcelain stoneware slabs on the walls, the building is finished with decorative plaster and is painted in pleasant colors.
As part of the construction of this residential complex, CVL was engaged in the supply of equipment for heating systems.
Miras RC
Nur-Sultan
2005-2009
General customer
ABK Kurylys LLP
Project description
The multi-apartment residential complex "Miras" is a 16-storey building with built-in commercial premises and is located in the Almaty district of Astana, near the intersection of kuyshi Dina st. and Abylai Khan Ave.
The slightly curved shape building was built using monolithic frame technology. The walls are filled with sand block and insulated. The outer walls are lined with yellow and red facing bricks. The thickness of the outer walls is 44 cm.
As part of the construction of this residential complex, CVL was engaged in the supply of equipment for heating systems.
Duet RC
Nur-Sultan
2005-2009
General customer
ABK Kurylys LLP
Project description
The residential complex "Duet" is located in the old center of the city, in the Almaty district of Astana, between Otyrar, Toraigyrov, Gabdullin and Kenesary streets.
The RC was handed off in 2005. The complex consists of two 12-storey buildings of the right shape, elongated along the Toraigyrov and Gabdullin streets. This ensures good insolation of the yard area.
As part of the construction of this residential complex, CVL was engaged in the supply of equipment for heating systems.
Edem Palace RC
Nur-Sultan
2003-2009
General customer
Astana Trade International JSC
Project description
Residential complexes "Edem Palace-1" and "Edem Palace-2" are located in the Almaty district of Astana, at the intersection of Kenesary and Valikhanov streets.
"Edem Palace-1" consists of six 16-storey blocks, there are 432 apartments in total. "Edem Palace-2" consists of five blocks with variable numbers of storeys (17-, 21-storey), the total number of apartments is over 400.
CVL carried out the installation of HVAC systems.
Nur-Sultan
Zolotoy RC
Zolotoy RC
Nur-Sultan
2003-2009
General customer
Astana Trade International JSC
Project description
The complex received the folklore name "Golden House" due to the unusual yellow-golden cladding. In addition, at the time of commissioning in 2003, almost all of the most presentable and expensive apartments in the city were presented here.
The house is constructed out of brick, has an L-shape, and consists of several sections with varying heights of 9 and 11 floors. On one of the roof sections of the buildings, there is a real summer garden.
CVL carried out monolithic and finishing works, as well as the supply of building materials.